rebuild of my 92 So i suck with computers but here are some pics from th first build to now. Its a slow rebuild. Only get one day a week to work on it. But little progress is beter than no progress..
Gonna do a three link with bags on lower bars and raise th bed floor. Very simple and clean is what im shooting for.
So im not good at keeping up with a build thread. But here is my 3 kink and i pocketed the frame for a 7" bag. Between work family and my side job cutting stuff on my cnc plasma, i dont get much time to tinker on this. With th 7" bag and cando arms it gets about 14" of lift off shop air 100psi.